FAQ
One team member (the contact person) should register, and the remaining members should be indicated when uploading the project
There is no limitation on the number of team members
There are no requirements regarding work experience or education for participation
There is no budget limit
Please rely on your own general assumptions. A geological survey of the site will be conducted at the design stage
These issues should be clarified by the participant directly with the community, if they wish to do so.
dditional photos will be taken by the organizers and participants during the site visit
It is not possible
Yes, it is possible if properly justified (any additional space must be supported by a valid rationale);
The areas are provided only for the residential building. The area may be either reduced or increased within a range of 5–10%.
The designated competition area is a segment of the entire almond orchard (136 ha), specifically a 7 ha section, which should be landscaped and include bicycle paths, pedestrian walkways, etc.